Login    
Test Lab Automation
Achieve increased utilization while saving time

Test Lab AutomationHave you ever wondered how much capital could be saved by pooling test devices and test equipment into one “virtual test lab” for everyone to access anywhere in the world?  How much additional money would your company make or save if you could reconfigure test set-ups in seconds instead of hours or days?  Solutions like these are now being deployed around the world to save time and increase utilization with a return on investment of 3 to 12 months!

The OnPATH Universal Connectivity System (UCS™) delivers a proven solution to create a Virtualized Infrastructure Layer (VIL) of the network infrastructure.  By providing the industry’s most scalable and secure technology, the overbuilding, troubleshooting, and manual reconfiguration for  network access can be significantly reduced – saving valuable time, space, power and, most importantly, capital. Here are just a few application examples:

  • Test lab reconfiguration
  • Port flapping and cable break simulation
  • Regression testing
  • Remote access and centralized device sharing
  • Data replication and multicast
     Test Lab Automation

Today our family of UCS™ hardware and UCMS™ software are providing valuable benefits for test lab automation.

Save time 

SAVE TIME

  • Execute moves, adds and changes instantly and reliably
  • Reduce downtime by quickly isolating and resolving path or circuit problems with system and circuit alarms
  • Automate record keeping and preparation time with the fully integrated remote activity scheduling and logging
 Increase utilization

 INCREASE UTILIZATION

  • Improve the access and utilization of expensive data center servers, storage and switching systems with up to 100,000 ports of ultra-reliable connectivity
  • Expand the accessibility and performance to quickly reconfigure test generators and monitoring tools from any location
  • Reduce personnel time and prevent errors during reconfiguration and troubleshooting
 Reduce costs

 REDUCE COSTS

  • Lower capital costs with higher equipment utilization and network performance
  • Lower operational costs through reduced equipment, optimized architectures, and higher reliability
  • Return on project investments ranging from 3 to 12 months